Building Our Dwelling – Page 2
- And up.
- More screws. These are helping support the second floor.
- To the second floor.
- And over the bottles.
- The shelf is a roll of wire that I cut to fit around the bottle tops.
- Two days dry.
- Not too pretty but sturdy and seems to have a fair insulating value.
- The ladder.
- Going up.
- Nothing too precise but works just fine.
- Some of the joints aren’t too close but the braces bridge the gaps.
- The bottles from the inside.
- just cut the greenhouse roof in half.
- Sunlight on the inside of the door.
- And the trailer end.
- Really crappy looking at this point.
- Bathroom and stove.
- Starting to dig the back foundation
- My modified saw blade.
- Some folks see junk. I see building materials.
- 2x6x16’s
- And more of them.
- Pieces of the old greenhouse wall.
- Bertha with another load of 2×6’s
- Wish I had more now. These are all gone.
- Framing the second floor.
- Temp bracing.
- Cat the water girl.
- Crappy sand mix.
- Getting it somewhat level.