bookshelves that are built are filled
and then some… Got 2 truck (toyota) loads of books here and all but 6 boxes put up. 3 more shelves can go in with little work so I'll be on that here in a bit. That and the other open spaces on the other 2 shelving sections should hold the rest of these 2 loads. About that much to go so will have to do the other side before I can finish loading them in.
Gonna have to get on other put off projects too. Bought 2 mobile homes yesterday (sat). The one I am getting is a 14 x 66 and set up as an office trailer. The big problem is the size of the thing. I'm gonna have to cut another road into the place to get it in where I want it to be. And since I have been wanting another entrance I guess that is a good thing. Or a somewhat good thing.
In looking at the entry yesterday afternoon, it looks like either the water meter is going to have to be moved or I am going to have to put the mobile home elsewhere. Or back it in. What ever happens, it will require more than a bit of earth and tree moving. Not to mention the amount of stuff I have been piling into that area to get out of the way down here. That is going to be the big job, I'm afraid. Several truckloads of stuff will have to be moved elsewhere. That is not going to be either easy or fun. Ah well.
The fibro is not too bad right now. I had a lot of pain in my forearms and hands last night and some left this morning but its at a level that I can still work so hoping that it will at least allow me to keep going till I get the books that are on the truck moved anyway. Then I will need to take a short break. Unfortuantly I need to unload Bertha and make a run to mcAuto for another load of stuff from up there. Don't think that will happen today. Tomorrow maybe. May take the toyota instead and try tying the big shelving unit to the back with the smaller stuff under or inside it. Or put the trip off till tomorrow if possible.