Bits

By , March 16, 2006 12:47 pm

Been working on moving shelving and such from the old PCH building in Jville the last few days. Moving it to the 14 wide. Got 12 4ft face sections in the main room now. That translates to 2 sets of 2 wall units and 2 sets of 2 double sided gondolas. Whole lot of storage/sales area. Also got one set of 2 wall units and one set fo 2 double sided gondolas in the the northmost room. Still got room for several (4 I hope) wall units in there.

Each hall will get 3 or 4 wall units and the back (south most) room will get a set of 2 doublesided gondolas to go with the shelves already in there.

Got the ladder moved over there today and went up to look at the roof problem(s). Most of it is in the walls. Has a lot of damage right at the roof line. I am thinking of screwing metal (of whatever type) over the gaps after filling them with foam. Got a roof vent in the bathroom that is crushed that I may just remove as no bathroom is needed (there is no water line over there).

Having a do nothing day. Over did it yesterday. Took down 48 feet of shelving at PCH and then worked till nearly 9 getting some back up at the trailer. Playing with computers today.

More later. Maybe… 😉

Leave a Reply

You must be logged in to post a comment.

Panorama Theme by Themocracy