tuesday bits
got the parlor stove installed and working in the 14×70. took 32 rows of cans 12 wide to fill the opening. about 4.5 80 lb bags of quickcrete sand topping mix at the point I am now. Got a bit more to do on the edges on the inside and another layer on both the outside and inside but hands are hurting too bad to try anymore right now.
limbs cleared off the trees the power wire will be hanging in. got the chainsaw, fuel and oil in the truck now waiting for hands to quiet down a bit before going at the pines, poplar, and sweet gum that are in the way. was going to clear them anyway later but get to do it sooner…