The drive was originally via overhead belt and has been converted to electric motor with 3 speed transmission. Cool adaption!

By , January 11, 2013 1:36 am

Ridgeport should have been Bridgeport. :-(

By , January 11, 2013 1:35 am

Stopped at the barn on the way back up to look at the milling machine. Turns out it’s a Rockford with a Rridgeport head grafted on.

By , January 11, 2013 1:34 am

Not sure if the wind will get to us but moved the truck to the field just in case.

By , January 11, 2013 1:32 am

Gonna have to get the paper out and work up some more plans to see how things will work if I do it that way. Still a long way off…

By , January 6, 2013 7:48 pm

Had planned on peaking it to the Q-hut with the low side to the north but if the high side is to the east it’ll be easier to add on later.

By , January 6, 2013 7:46 pm

Then I can start hauling rock and gravel and pouring concrete. Starting to think about making the front extension peak to the east.

By , January 6, 2013 7:45 pm

Moved another load of brush/trash to the pile in the field. Looks like another 10 loads or so will get the area in front of the Q-hut done.

By , January 6, 2013 7:43 pm

Feeling some better after another 2 days sitting and doing nothing trying to get rid of this bug/crud.

By , January 6, 2013 7:42 pm

Fascinating 1936 footage of car assembly line. [VIDEO] http://t.co/xQ4vZzWY Awesome!!!

By , January 5, 2013 3:45 am

It’s National Spaghetti Day: http://t.co/yPqm2KiY

By , January 4, 2013 8:42 pm

Rich English Guy and his Trebuchet – YouTube http://t.co/BI08Vn3E LOL!!!

By , January 4, 2013 4:27 am

Though actually I’m doing some of that work in the late night hours. At least cleaning up a bit and sorting stuff out. Big elephant…

By , January 3, 2013 7:00 pm

As I said yesterday, this is a serious sequential vortex. One day I’ll get back to working on the inside of the Q-hut.

By , January 3, 2013 6:59 pm

Several live ones too but the dead ones need to come down now.

By , January 3, 2013 6:58 pm

After that’s cleared will start on the west side of the Q-hut to drop the dead pines. Got 2 dead ones that are 80+ foot high that gotta go.

By , January 3, 2013 6:57 pm

Still clearing stuff out front. Which is north of the Q-hut and west of the parking area. Tis quite a jungle out there.

By , January 3, 2013 6:56 pm

Gonna have to go out and measure some more and see what can be done without totally blocking the parking area.

By , January 2, 2013 11:25 pm

And that will clear off the area in the back to be able to stack stuff on to clear off even more in back to start building back there too…

By , January 2, 2013 11:23 pm

Thinking about moving the 10×20 to the front to use to house tools to build the shed to house the tools to rebuild the inside of the Q-hut.

By , January 2, 2013 11:22 pm

Panorama Theme by Themocracy