After all there is tomorrow. And the ceiling isn’t going anywhere. But a shower would be nice. Ah, nap time wins. Back in a bit.![]()
And doing things on the ladder when this tired is not a good thing. May take a nap and then see if I feel up to working or just waiting.![]()
Have now gotten one more row of wood installed. Ended up with folks over. Only problem is that I am now about worn out.![]()
Have a few pieces that are dry and can go up while the rest are drying.![]()
Forgot the step after get lumber from pile, which goes, lay it out in the sun so it can dry a bit prior to dripping all over the house.![]()
Now to get more lumber from the pile, clean of nails and start hanging it up. Back in a bit.![]()
Both for less than one pound of either would have cost at Lowe’s. Stupid big box stores!![]()
Back from a quick trip to Warren’s Ace Hardware in Jville. Got 2 different sizes of screws that I was out of. 1 5/8 x #6 and 2 1/2 x #8![]()
Guess I need to get dressed for public and go get more screws to finish the ceiling. Back in a bit.![]()
Am up, and waiting for coffee to be. Fire going and temp rising a bit. Bod is saying to call the day off and go back to bed.![]()
Temps: Highs – Outside 53.6 Inside 71.1
Lows – Outside 45.3 Inside 62.1
Current – Outside 45.7 Inside 66.6![]()
and I’ve done all of the standing on one of those that my tired old bod will tolerate today. Will start on the fun overhead stuff tomorrow.![]()
Gonna call it a night as far as construction goes. The stuff that needs to be done next is gonna have to be done from a ladder![]()
Platform built, washer and dryer put into place. Floor and surrounding area kinda rough cleaned. Tis starting to look like living quarters.![]()
platform built, put in place and appliances put back in place. Guess that’s next on the list for the evenings entertainment…