Fresh From Twitter today
![]()
Last 2 pieces of flooring cut and installed. Thinking about starting on striping the ceiling but gonna get some firewood in first.![]()
Then I can start with the strips on the ceiling and get the first piece of bubble wrap insulation up. Which may or may not happen tonight.![]()
2 more pieces of wood to cut and put down and the first leg of the loft will be done, or at least as done as it’s gonna get tonight…![]()
Going back on my head now, coffee break is over… 😉![]()
The bit that was needed to fill in to the 2×4 slot I’m leaving open for the pony tail palm was 16 1/2 on one side and 13 1/2 on the other.![]()
And NO, nothing is straight with ANYTHING else. One end of the 4×8 sheet of OSB had to have 3 inches cut off one edge to 0 on the other.![]()
First sheet of decking down in the loft. 2×4 connector blocks cut n fixing to be put in. Will be glad when this is LITTLE project is done.![]()
Got a couple of more pieces of wood cut and screwed in place. 2 more to go on this first section till I can start on the decking.