Fresh From Twitter today

By , December 20, 2009 11:34 pm

Last 2 pieces of flooring cut and installed. Thinking about starting on striping the ceiling but gonna get some firewood in first.

Then I can start with the strips on the ceiling and get the first piece of bubble wrap insulation up. Which may or may not happen tonight.

2 more pieces of wood to cut and put down and the first leg of the loft will be done, or at least as done as it’s gonna get tonight…

Going back on my head now, coffee break is over… πŸ˜‰

The bit that was needed to fill in to the 2×4 slot I’m leaving open for the pony tail palm was 16 1/2 on one side and 13 1/2 on the other.

And NO, nothing is straight with ANYTHING else. One end of the 4×8 sheet of OSB had to have 3 inches cut off one edge to 0 on the other.

First sheet of decking down in the loft. 2×4 connector blocks cut n fixing to be put in. Will be glad when this is LITTLE project is done.

Got a couple of more pieces of wood cut and screwed in place. 2 more to go on this first section till I can start on the decking.

Panorama Theme by Themocracy