Fresh From Twitter today

By , December 21, 2009 11:55 pm

First batch of insulation is moved. Got one more batch to go and then can finish tearing down the raised platform behind the woodburner.

First section of insulation is cut and up. Fixing to dress for the job and move the pile of fiberglas insulation into the back of the loft.

Now to clear floor in here so the 6′ by 12′ sections of insulation can be cut. First am gonna go and cut some more firewood and bring in.

Several hundred screws sorted. Boards to be used for stripping to hold insulation cleaned of nails and those above finished loft installed.

But, damn, it’s taking a LONG time to eat this elephant… πŸ˜‰

Now to clear the crap out from the floor, put plastic down then carpet, and move the table and chairs out there. Getting closer…

Light and switch are installed in the south room under loft ceiling. Whole thing is rough as a cob but it matches the rest of the compound.

Got the firewood in. Decided to put up a light in the south room under the new loft instead of doing the stripping on the ceiling.

Panorama Theme by Themocracy