First batch of insulation is moved. Got one more batch to go and then can finish tearing down the raised platform behind the woodburner.![]()
First section of insulation is cut and up. Fixing to dress for the job and move the pile of fiberglas insulation into the back of the loft.![]()
Now to clear floor in here so the 6′ by 12′ sections of insulation can be cut. First am gonna go and cut some more firewood and bring in.![]()
Several hundred screws sorted. Boards to be used for stripping to hold insulation cleaned of nails and those above finished loft installed.![]()
But, damn, it’s taking a LONG time to eat this elephant… 😉![]()
Now to clear the crap out from the floor, put plastic down then carpet, and move the table and chairs out there. Getting closer…![]()
Light and switch are installed in the south room under loft ceiling. Whole thing is rough as a cob but it matches the rest of the compound.![]()
Got the firewood in. Decided to put up a light in the south room under the new loft instead of doing the stripping on the ceiling.