Fresh From Twitter today
![]()
Coffee and food consumed. Now to get up the energy to go to Lowe’s.![]()
Tis just the usual sequential vortex of projects around here. Time to quit blathering and go get coffee and food.![]()
put up the support posts for the rest of the loft, which is what I have been trying to get done this whole time.![]()
woodburner to get to the bottom 1/3 of 1/2 of the wall, so that bit isn’t gonna be very easy. But I can get enough of the wall done to![]()
Then will just have the west wall to finish insulating. Course I have to remove the block and brick that is stacked on the west side of the![]()
carry. Come back, then clear the floor in here so I can roll out and cut the insulation for the rest of the south room ceiling.![]()
Was still a bit warm when straddling the flue to screw the last bit in. Now to eat, go to Lowe’s to pick up some stuff Wally World doesn’t![]()
Got the last 3 ceiling strips up. Had to put up temp scaffolding to get to the area over the woodburner. Twas still burning but not high.![]()
Supports on the west end. Thinking I will use cedar for these. Coffee is gone so guess I need to get out and at it.![]()
Or actually procrastinating at the present while getting more caffeine in my system via coffee. Need to go and cut 2 more posts for loft![]()
Working on an additional support for the insulation were it’s not meeting the stud after turning the corner from south to west walls.![]()
Got the upper west window in the south room cleaned from the inside. Will be easier when the rest of the loft is in place.