Fresh From Twitter today
![]()
Remembered we need to go to the store so am gonna do that instead. And a sigh of great relief is heard from assorted muscles… 😉![]()
Gonna try for one more load tonight and then call it quits on that anyway. Back later…![]()
Looks like we’ll need more like 9 or 10 loads that size. Or more. Got an old plastic fence panel and poured the gravel on it to drain/dry.![]()
Figure the barrow full weighs between 5 and 6 hundred pounds, and at a guess, thinking we’ll need 5 or 6 of them to do the fill and cob.![]()
First load of creek gravel pushed up here. Now to figure out how to dry it so I can bring it in to fill with. Don’t want to bring it in wet.![]()
Time to clean out/off the rubber boots I set on the back porch earlier today after being buried in the rubble in here for months.![]()
Thinking about going to the creek with the wheelbarrow to get a load of gravel to set the rock in with. Will need to dry so guess I need to.![]()
First piece of tin screwed in place. Rocks and urbanite holding it tight at the bottom. Had to take a break from picking and choosing rocks.![]()
Lunch done. Trying to find the energy to put the tin on the wall. However energy seems to be hiding very well right now.![]()
Think I am gonna take a break and read a bit then eat lunch. Till later, folks…![]()
The rock will give me a good start on the base for the heat storage bench for the Rocket Mass Heater. Slowly, slowly, eats the elephant.![]()
Soon as the tin dries out will straighten the bends a bit and start attaching it to the studs. Then can pile the stone against it.![]()
Will have to space the loft support posts out a bit but that’s probably for the good anyway.![]()
Turned out I had two sheets of the old tin so can do the entire bottom of that wall rather than just the north end.![]()
Guess I need to go out and get the tin to put up on the wall. After another cup of coffee that is…